April 24, 2023 Kunsan weather flight: Forecasting the fight Although aircraft assigned to the 80th and 35th Fighter have left Kunsan for the duration of the runway’s renovation, the 8th Operations Support Squadron weather flight remains dedicated to their mission at the 8th Fighter Wing.
April 24, 2023 8th OSS forecasting the fight Although aircraft assigned to the 80th and 35th Fighter have left Kunsan for the duration of the runway’s renovation, the 8th Operations Support Squadron weather flight remains dedicated to their mission at the 8th Fighter Wing.