Photos

Keyword: Category: Tag: Sort By:
U.S. Air Force Airman 1st Class Curtis Doherty, 374th Maintenance Squadron aircraft metals technology journeyman, welds a post hole for a B-1 platform at Yokota Air Base, Japan, June 23, 2015. The average time it takes to fix or create a piece of equipment is approximately eight hours. (U.S. Air Force photo by Senior Airman David Owsianka/Released)


Sparks fly at Metal tech.

U.S. Air Force Airman 1st Class Curtis Doherty, 374th Maintenance Squadron aircraft metals technology journeyman, welds a post hole for a B-1 platform at Yokota Air Base, Japan, June 23, 2015. The average time it takes to fix or create a piece of equipment is approximately eight hours. (U.S. Air Force photo by Senior Airman David Owsianka/Released)

Related Imagery
Senior Airman David Owsianka
150623-F-CB366-073.JPG

DOWNLOAD PHOTO
(0.65 MB)



Tags
equipment, welding, maintenance, Metal technology, machining



< Back to Main Gallery