Airfield Damage Repair Facility Opens at Osan Air Base

  • Published
  • By Staff Sgt. Dustin Braaten
  • 51st Fighter Wing Public Affairs

A newly constructed Airfield Damage Recovery warehouse at Osan Air Base is ready for use after its ribbon-cutting ceremony on December 3, 2025. The project was a joint effort by USACE-FED, the ROK Military National Defense - Defense Installations Agency, and the 51st Civil Engineer Squadron.